Comprehensive evaluation of sealing ability of Tonggang fault in the Bachu uplift of the Tarim basin
- Vol. 29, Issue 6, Pages: 769-773(2008)
Online First:24 December 2008,
Published:2008
DOI: 10.11743/ogg20080610
移动端阅览

Online First:24 December 2008,
Published:2008
移动端阅览
相关文章
相关作者
相关机构