[1] King G R.Material balance techniques for coal seam and Devonian shale gas reservoirs with limited water influx[J].SPE Reservoir Engineering,1993,8(1):67-72
[2] Ahmed T,McKinney P.Advanced Reservoir Engineering(Chapter3)[M].Amsterdam,Holland:Gulf Professional Publishing,2005.217-230
[3] 陈元千,李塑.现代油藏工程[M].北京:石油工业出版社,2001.112~126
[4] King G R,Ertekin T,Schwerer F C.Numerical simulation of the transient behavior of gas seam degasification wells[J].SPE Formation Evaluation,1986,1(2):165-183
[5] Seidle J P.A modified p/Z method for coal wells[A].In:SPE 55605,the 1999 SPE Rocky Mountain Regional Meeting,Gillette,Wyoming,USA,1999
[6] Penuela G,Ordonez A,Bcjarano A.A generalized material balance equation for coal seam gas reservoirs[A].In:SPE 49 225,the 1998 SPE Annual Technical Conference and Exhibition,New Orleans,Louisiana,USA,1998
[7] Gas Research Institute.A Guide to Coalbed Methane Reservoir Engineering(Chapter 3)[Z].Gas Research Institute,1996 |